Previously Funded Areas
FY08 - Engineering, Design & Construction (Various Locations)
- Infiltration Construction - Area 2, 24 & 21(L)
- Area 22(Prelim. Design - Infiltration)
FY09 and FY10 No funding requested
FY11 - Area 16 and 22 Started
FY12 - Area 16 - Area 22 - Construction (continuation)
FY13 – Phase I I/I Feasibility Study and Cost Benefit Analysis
FY 14 – Phase II I/I Townwide System Master Plan
Proposed Funded Areas
FY 15 – FY17 Area Determined by Study