Town Stormwater Projects
Below is a list of projects that the Town has completed or plans to complete to improve stormwater infrastructure throughout Town.
| Year | Status | Location | Description of Work |
| 2002-2003 | Complete | Dredge Sportsman Pond | Increase storm water storage capacity |
| 2007 | Complete | Lake Drive | Install stormdrain down Lake Drive to divert some of the stormmwater going down May Street to Rosemary Lake |
| 2009 | Complete | Chestnut Street Marsh to Charles River | Upgrade structures and drainage for road reconstruction to upgrade the culvert under Chestnut Street at Eversource property |
| 2010 | Complete | MBTA Culvert at Chestnut | Repaired collapsed culvert under MBTA tracks to Maple Street |
| 2010 | Complete | Rosemary Brook | Stone wall repairs along brook to improve stormwater flow |
| 2010 | Complete | Wellesley Ave | Add pipe and Install dry wells |
| 2013 | Complete | Bradford at Manning | Improve stormdrain From GPA at Manning to Otis at Manning to increase overflow capacity |
| 2013 | Complete | Rosemary Glenn (Perry Drive) | Brook and culvert work to Trout Pond and intall storm ceptor at Perry Drive and Marked Tree Road |
| 2013 | Complete | GPA at Mary Chilton | Upgrade drain to divert stormwater away from private property |
| 2014 | Complete | Broadmeadow School | Upgraded baseball field berm and remove exisitng pipe |
| 2015 | Complete | Lantern Lane | Install catch basin and culvert with headwall to wetlands |
| 2015 | Complete | Edgewater Drive | Culvert improvements |
| 2015 | Complete | Gayland/Surry/Warren Drainage | Route stormdrain from Gayland to Surry and increase pipe size |
| 2015 | Complete | Warren/Kingsbury | Upgrade drainage structures, reroute stormdraina and add check valve to control surcharging |
| 2015 | Complete | Mills Field | Install pervious pavers and underdrain system for storage and infiltration |
| 2016 | Complete | Memeroial Park | Upgraded drainage at the field and parking lot install stormwater quality units |
| 2016 | Complete | Greendale Ave Phase 1 | Improve stormdrain outfall at Cheney Street and increase pipe size to Kendrick Street. |
| 2016 | Complete | Norfolk Small Diameter Drain | Upgrade drain at Webster Street down Norfolk Street |
| 2016-2017 | Complete | Kimbal Street Lot | Install cultec systems for stormwater storage and improved water quality |
| 2017 | Complete | Memorial Field Field House | Upgrade infiltration Systems for new Building |
| 2018 | Complete | Forest Street | 132 Forest Upgrades from storm washout |
| 2018 | Complete | Greendale Ave Phase 2 | Upgrade drainage structures and pipe size from Kendrick Street to Parker Road |
| 2019 | Complete | Highland at West Drainage Improvements | Upgrade drain and install wier to control flow in flood events |
| 2019 | Complete | Down Town Upgrades | Divert stormwater away from Lincoln Street |
| 2020 | Complete | Rosemary Dredging | Increase stormwater storage capacity and improve water quality |
| 2021 | Complete | RTS Stormwater Management | Install BMPs to control flow and quaity of stormwater on site |
| 2022 | Complete | Harris Ave Infliltraion | Divert stormwater to storage /Infiltration away from Licoln Street |
| 2022 | Complete | Walker Pond Stormwater Upgrades | Install infiltration system from Walker Lane road run off to walker pond |
| 2023 | Complete | Concord and Burnside Drain Phase 1 | Upgrade stormdrain from 12" to 24" pipe on Greendale Ave from Parker to Bennington |
| 2023 | Complete | Mclead Field (Defazio) 48" Drain | Upgrade existing 48" stormdrain that runs under McLeod Field to the Resivour |
| FUTURE | |||
| 2023 | Coming Spring 2024 | Concord and Burnside Drain Phase 2 | Upgrade stormdrain from 12" to 24" pipe from Concord at Burnside to Bennington at High Street |
| 2024 | Coming Spring 2024 | Rosemary Sluice Gate Replacemwent | Replace broken sluice gate at Rosemary dam overflow structure |
| 2024 | Coming Spring 2024 | South Street (Charlesriver St to Chestnut) | Adding infiltration along the new water line replacement route from Charlesriver Street to Chestnut Street |
| 2024 | Coming Summer 2024 | Resivour Dredging | Upgrade BMPs and dredge resivour to increase stormwater capacity and water quality |
| 2024 | Design | Walker Pond Stormwater Upgrades Pase 2 | Upgrade outlet control structure and install headwall at inlet pipe to Walker Pond |