Project Communications Updates and Photos
Project Updates from Eversource:
Week of August 10, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue.
- Crews will continue excavation activities on South Street between Dedham Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of August 3, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue.
- Crews will continue excavation activities on South Street between Dedham Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of July 27, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue.
- Crews will continue excavation activities on South Street between Dedham Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of July 20, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue.
- Crews will continue excavation activities on South Street between Dedham Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of July 13, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue.
- Crews will continue excavation activities on South Street between Dedham Ave. and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities and install sewer bypass on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of July 6, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street across Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m. A one-way alternating traffic pattern will be utilized on Dedham Avenue. Map of Detour here.
- Crews will drill test holes on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities and install sewer bypass on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road is open.
Week of June 29, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue installation of manhole and drill test holes on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. Peacedale Road is open.
Week of June 22, 2020:
- Crews continued excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued installation of manhole on South Street between Great Plain Avenue and Needhamdale Road. South Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road was closed and a traffic detour was in place between 8 a.m. and 5 p.m.
- Crews mandrel proofed duct bank that had previously been installed on Peacedale and Valley Road. A one-way alternating traffic pattern was utilized on Peacedale Road between 8 a.m. and 5 p.m.
Week of June 15, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will conduct manhole work on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will begin installation of manhole on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue installation of manhole and continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of June 8, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will conduct manhole work on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will conduct water main realignment work on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will install a manhole and continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of June 1, 2020:
- Crews continued excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews conducted water main realignment work and continued excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street was be closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street was closed and a traffic detour was in place between 7 a.m. and 5 p.m.
- Crews continued excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road was closed and a traffic detour was in place between 8 a.m. and 5 p.m.
Week of May 25, 2020:
- No construction work will take place on Monday, May 25th in observance of Memorial Day.
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities and conduct manhole work on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Great Plain Avenue from Peacedale Road to South Street. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of May 18, 2020:
- Crews will begin excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of May 11, 2020:
- Crews will continue excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m
Week of May 4, 2020:
- Crews will begin excavation activities on South Street between Canterbury Lane and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m. (SEE THE ATTACHMENT FOR THE UPDATED TRAFFIC MANAGEMENT PLAN)
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of April 27, 2020:
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of April 20, 2020:
- No project work will take place on Monday, April 20, in observance of Patriot’s Day.
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
Week of April 13, 2020:
- Crews will continue excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will continue excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
- A crew will begin conduit maintenance activities inside an existing manhole on Peacedale Road between Norwich Road and Intervale Road. Maintenance work will require an alternating traffic pattern.
Week of April 6, 2020:
- Crews will begin excavation activities on South Street between Needhamdale Road and Dedham Avenue. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will begin excavation activities on South Street between Great Plain Avenue and Needhamdale Road. South Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
- Crews will begin excavation activities on Peacedale Road between Peacedale Circle and Great Plain Avenue. The entrance on Peacedale Road will be closed and a traffic detour will be in place between 8 a.m. and 5 p.m.
- Crews will begin excavation activities on High Rock Street between South Street and Chestnut Street. High Rock Street will be closed, and a traffic detour will be in place between 7 a.m. and 5 p.m.
Week of March 30, 2020:
- Crews continued pre-construction activities on South Street and High Rock Street in preparation for excavation activities. Road closures and traffic detours will be in place.
Weeks of December 23 and 30, 2019:
- Construction crews will be removing materials from the construction work area located at the end of Valley Road in preparation for the winter season.
Week of December 16, 2019:
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road near the entrance to Great Plain Avenue, construction crews will mobilize to continue duct bank excavation. The entrance on Great Plain will be closed during this work.
Week of December 9, 2019:
- On Valley Road between Norwich Road and Peacedale Road, crews continued to install duct bank, which houses electric cable. The road was closed except to local traffic.
- On Peacedale Road between Norwich Road and Intervale Road, crews realigned a stormwater drain near a newly installed manhole. The road was closed except for local traffic.
Week of December 2, 2019:
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of November 25, 2019:
- On Peacedale Road between Norwich Road and Intervale Road, crews will work on realigning a stormwater drain near a newly installed manhole. The road will be closed except for local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of November 18, 2019:
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will begin to transition water service from the temporary water main to the new, underground water main. Peacedale Road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of November 11, 2019:
- On Peacedale Road between Intervale Road and Valley Road, crews will continue to install an underground watermain, in support of project work. The road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of November 4, 2019:
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install an underground water main, in support of project work. The road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of October 28, 2019:
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install an underground water main, in support of project work. The road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of October 21, 2019:
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install an underground water main, in support of project work. The road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of October 14, 2019:
- On High Rock Street between Emerson Road and Chestnut Street, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install an underground water main, in support of project work. The road will be closed except to local traffic.
- On Valley Road between Norwich Road and Peacedale Road, crews will continue to continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of October 7, 2019:
- On High Rock Street between Emerson Road and Chestnut Street, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On Peacedale Road between Great Plain Avenue and Valley Road, crews will continue to install an underground water main, in support of project work. The road will be closed except to local traffic.
- Crews will work in this location on Saturdays from 8:30 a.m. to 4:30 p.m.
Week of September 30, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- Crews will work in this location on Saturdays from 8:30 a.m. to 4:30 p.m.
Week of September 23, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- Crews will work in this location on Saturdays from 8:30 a.m. to 4:30 p.m.
- On South Street between Dedham Avenue and Livingston Circle, crews will continue to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
- On South Street between Old Farm Road and Lawton Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour during working hours.
Week of September 16, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank. There will be one lane closed, resulting in alternating traffic patterns.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic. Crews will work at this location on Saturday from 8:30 a.m. to 4:30 p.m.
- On South Street between Dedham Avenue and Livingston Circle, crews will continue to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
- On South Street between Lawton Road and Longacre Road, crews will return to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
Week of September 9, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank. There will be one lane closed, resulting in alternating traffic patterns.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
- On South Street between Dedham Avenue and Livingston Circle, crews will begin to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
Week of September 2, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews continued to excavate and install duct bank, which houses electric cable.
- On Great Plain Avenue between South Street and Greendale Avenue, crews continued to excavate and install duct bank.
- On Valley Road between the cul-de-sac and Norwich Road, crews continued to excavate and install duct bank.
- On Peacedale Road between Sterling Road and Intervale Road, crews continued to install duct bank.
Week of August 26, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank, which houses electric cable. The road will be closed except to local traffic.
Week of August 19, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank. There will be one lane closed, resulting in alternating traffic patterns.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank. The road will be closed except to local traffic.
Week of August 12, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews continued to excavate and install duct bank, which houses electric cable.
- On Great Plain Avenue between South Street and Fairfield Road, crews continued to excavate duct bank.
- On Valley Road between the cul-de-sac and Norwich Road, crews continued to excavate and install duct bank.
- On Peacedale Road between Sterling Road and Intervale Road, crews will continue to install duct bank.
Week of August 5, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On South Street between Old Farm Road and Lawton Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale Road between Sterling Road and Intervale Road, crews will begin to install duct bank, which houses electric cable.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of July 29, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On South Street between Old Farm Road and Lawton Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale Road, crews will finish installing an existing manhole, a pre-cast concrete vault. Peacedale Road between Norwich Road an Intervale Road will be closed for 24 hours for the duration of the manhole installation.
- On Great Plain Avenue between South Street and Greendale Avenue, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of July 22, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of July 15, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of July 8, 2019:
- On Tuesday, July 9, on High Rock Street between Richardson Drive and Emerson Road, crews will be conducting some restoration work in the road. There will be one lane closed, resulting in alternating traffic patterns.
- On High Rock Street between Chestnut Street and South Street, crews will begin to install a manhole, a precast concrete vault. The road will be closed and there will be a detour in place during working hours.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during working hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of July 1, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews continued to excavate and install duct bank, which houses electric cable.
- On South Street between Great Plain Avenue and Longacre Road, crews continued to excavate and install duct bank, which houses electric cable.
- On Great Plain Avenue between South Street and Fairfield Road, crews continued to excavate duct bank, which houses electric cable.
- On Valley Road between the cul-de-sac and Norwich Road, crews continued to excavate and install duct bank, which houses electric cable.
- On South Street between Webster Street and Dedham Avenue, crews continued to install a manhole, a precast concrete vault.
Week of June 24, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On South Street between Webster Street and Dedham Avenue, crews will continue to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will begin to excavate and install duct back, which houses electrical cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of June 17, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- There will be no work in this section on Wednesday, June 19th due to the half day schedule of the schools
- On South Street between Webster Street and Dedham Avenue, crews will continue to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will begin to excavate and install duct back, which houses electrical cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of June 10, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On South Street between Webster Street and Dedham Avenue, crews will continue to install a manhole, a precast concrete vault. The road will be closed and there will be a detour during working hours.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Great Plain Avenue between South Street and Fairfield Street, crews will begin to excavate and install duct back, which houses electrical cable. There will be one lane closed, resulting in alternating traffic patterns.
Week of June 3, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews continued to excavate and install duct bank, which houses electric cable.
- On South Street between Webster Street and Dedham Avenue, crews continued to install a manhole, a precast concrete vault.
- On South Street between Great Plain Avenue and Longacre Road, crews continued to excavate and install duct bank, which houses electric cable.
- On Valley Road between the cul-de-sac and Norwich Road, crews began to excavate and install duct bank, which houses electric cable.
Week of May 27, 2019:
- On High Rock Street, between Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. One lane will be closed, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank. The road will be closed and there will be a detour in place during work hours.
- On South Street between Needhamdale Road and Lawton Road, crews will be excavating to confirm the location of existing utilities. The road will be closed and there will be a detour in place during work hours.
- On South Street between Canterbury Lane and Webster Street, crews will continue installing a manhole, a precast concrete vault. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will begin to excavate and install duct bank. The road will be closed except for local traffic.
- Crews will be in Cutler Park to update erosion controls and grade the access roads.
Week of May 20, 2019:
- On High Rock Street between Richardson Drive and Emerson Road, crews continued to excavate and install duct bank, which houses electric cable.
- On South Street between Great Plains Avenue and Longacre Road, crews continued to excavate and install duct bank.
- On South Street between Canterbury Lane and Webster Street, crews will continue installing a manhole (a precast concrete vault).
- On Valley Road between the cul-de-sac and Norwich Road, crews continued to excavate and install duct bank.
- On Peacedale Road between Norwich Road and Intervale Road, crews installed drainage for the manhole (a precast concrete vault).
- Crews were in Cutler Park to update erosion controls and grade the access roads.
Traffic Detour 5/13/19 (PDF)
Week of May 13, 2019:
- On High Rock Street between the Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be one lane closed, resulting in alternating traffic patterns.
- On South Street between Canterbury Lane and Dedham Avenue, crews will begin to install a manhole (a precast concrete vault). The road will be closed except for local traffic and a detour will be in place during work hours.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will begin to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale between Norwich Road and Intervale Road, crews will continue to install a manhole (a precast concrete vault). The road will be closed except for local traffic and a detour will be in place during working hours. Outside working hours a continues one lane detour will be in place (see the traffic management plan).
- Crews will be in Cutler Park updating erosion controls and grading the access roads.
Traffic Update: 5/6/19 (PDF)
Week of May 6, 2019:
- On High Rock Street between the Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be a single lane of closure, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will begin to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale between Norwich Road and Intervale Road, crews will begin to install a manhole (a precast concrete vault). The road will be closed, and a detour will be in place during working hours. Outside working hours a continues one lane detour will be in place.
Week of April 29, 2019:
- On High Rock Street between the Richardson Drive and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be a single lane of closure, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will begin to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale between Norwich Road and Intervale Road, crews will begin to install a manhole (a precast concrete vault). The road will be closed, and a detour will be in place during working hours. Outside working hours a continues one lane detour will be in place.
Week of April 22, 2019:
- On High Rock Street, between the MBTA corridor and Richardson Drive, crews will continue to excavate and install duct bank, which houses electric cable. There will be a single lane of closure, resulting in alternating traffic patterns.
- On High Rock Street between Emerson Road and Chestnut Street, crews will continue to install a manhole (a precast concrete vault). The road will be closed and there will be a detour in place during working hours.
- On South Street between Livingston Circle and South Court, crews will conduct subsurface test pitting to locate existing utilities. There will be a single lane of closure, resulting in alternating traffic patterns.
- On South Street between Great Plain Avenue and Longacre Road, crews will continue to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
- On Valley Road between the cul-de-sac and Norwich Road, crews will begin to excavate and install duct bank, which houses electric cable. The road will be closed except for local traffic.
- On Peacedale between Norwich Road and Intervale Road, crews will begin to install a manhole (a precast concrete vault). The road will be closed, and a detour will be in place during working hours. Outside working hours a continues one lane detour will be in place (see the traffic management plan).
Traffic Updates 4.22.19
Detour Peacedale Map (PDF)
Week of April 15, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
- On High Rock Street, between the MBTA corridor and Emerson Road, crews will continue to excavate and install duct bank, which houses electric cable. There will be a single lane of closure, resulting in alternating traffic patterns.
- On High Rock Street between Emerson Road and Chestnut Street, crews will begin to install a manhole (a precast concrete vault). The road will be closed and there will be a detour in place during work hours.
- On South Street between Great Plains Avenue and Longacre Road, crews will begin to excavate and install duct bank, which houses electric cable. The road will be closed and there will be a detour in place during work hours.
Week of April 8, 2019:
- On High Rock Street between the MBTA corridor and Richardson Street, crews returned to excavate and install duct bank, which houses electric cables.
- On High Rock Street between Emerson Road and Chestnut Street, crews began to install a manhole (a precast concrete vault).
Week of April 1, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
- On High Rock Street, between the MBTA corridor and Richardson Street, crews will return to excavate and install duct bank, which houses electric cable. There will be a single lane of closure, resulting in alternating traffic patterns.
- On High Rock Street between Warren Street and South Street, crews will be conducting subsurface soil sampling to help with the design. There will be a single lane of closure, resulting in alternating traffic patterns.
Week of March 25, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
Week of March 18, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
Week of March 11, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
Week of March 4, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
Week of February 24, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
Week of February 18, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
Week of February 11, 2019:
- On the MBTA corridor off High Rock Street, crews will continue to excavate and install the duct bank, which houses electric cables.
Week of February 3, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
Week of January 28, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
Week of January 21, 2019:
- On the Massachusetts Bay Transportation Authority (MBTA) corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
- In Cutler Park, the portion of the Blue Heron Trail was reopened.
Week of January 7, 2018
- On the MBTA corridor off High Rock Street, crews continued excavating and installing the duct bank, which houses electric cables.
- On the right of way (power line corridor) off Valley Road, crews will continue removing protective matting.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of December 31, 2018
- On the MBTA corridor off High Rock Street, crews will continue excavating and installing the duct bank, which houses electric cables.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of December 24, 2018
- On the MBTA corridor off High Rock Street, crews will continue excavating and installing the duct bank, which houses electric cables.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of December 17, 2018
- On Valley Road, crews will continue excavating for a duct bank, which houses electric cables. The road will be closed except for local traffic.
- On South Street, between Old Farm Road and Great Plain Avenue, crews will continue installing a man-hole, a pre-cast concrete vault. South Street will be closed between Old Farm Road and Great Plain Avenue between 9 a.m. and 5 p.m. Monday through Friday. Outside work hours, there will be a one-way detour set up through December 21.
- On the right of way (power line corridor) off Valley Road, crews will remove old transmission wire from existing structures.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of December 10, 2018
- On Valley Road, crews excavated for a duct bank, which houses electric cables.
- On South Street, between Old Farm Road and Great Plain Avenue, crews began installation for a man-hole, a pre-cast concrete vault.
- On the right of way (power line corridor) off Valley Road, crews removed old transmission wire from existing structures.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of December 3, 2018
- On the MBTA corridor off High Rock Street, crews will excavate for a duct bank, which houses electric cables.
- On Valley Road, crews will excavate for a duct bank, which houses electric cables. The road will be closed except for local traffic.
- On the right of way (power line corridor) off Valley Road, crews will continue to install new transmission wire on the new structures.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through Winter 2019, due to construction.
Week of November 26, 2018
- On the MBTA corridor off High Rock Street, crews will excavate for a duct bank, which houses electric cables.
- On Valley Road, crews will excavate for a duct bank. The road will be closed except for local traffic.
- On the right of way (power line corridor) off Valley Road, crews will install new transmission wire on the new structures using helicopters. Helicopter flights are scheduled from 6 a.m. to 11 a.m.. pending approvals.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Week of November 19, 2018
- On the MBTA corridor off High Rock Street, crews will excavate for a duct bank, which houses electric cables.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through winter 2019, due to construction.
Traffic Updates: Week of November 12, 2018 (PDF)
Week of November 12, 2018:
- On High Rock Street between the MBTA corridor and Emerson Road, crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will continue excavation for the duct bank. The road will be closed except for local traffic.
- On Peacedale Road, crews will install a manhole (a precast concrete vault). There will be a single-lane detour between Norwich Road and Intervale Road.
- On the right of way (power line corridor) off Valley Road, crews will install new transmission wire on the new structures, using helicopters. Helicopter flights will be from 6 a.m. to 11 a.m. and will occur on the weekend.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
Traffic Updates: Week of November 5, 2018 (PDF)
Week of November 5, 2018:
- On High Rock Street between the MBTA corridor and Emerson Road, crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will continue excavation for the duct bank. The road will be closed except for local traffic.
- On Peacedale Road, crews will relocate adjacent underground utilities to make room for a manhole (a precast concrete vault).
- On the right of way (power line corridor) off Valley Road, crews will install foundations.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
- Traffic Updates: Week of October 29, 2018 (PDF)
Week of October 29, 2018:
- On High Rock Street between the MBTA corridor and Emerson Road, crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will continue excavation for the duct bank. The road will be closed except for local traffic.
- On Peacedale Road, crews will relocate adjacent underground utilities to make room for a manhole (a pre-cast concrete vault).
- On the right of way (power line corridor) off Valley Road, crews will install foundations.
- In Cutler Park, the portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
Week of October 22, 2018:
- On High Rock Street between the MBTA corridor and Emerson Road, crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will continue excavation for the duct bank, which houses electric cables. The road will be closed except for local traffic.
- On Peacedale Road, crews will relocate adjacent underground utilities to make room for a man-hole (a pre-cast concrete vault).
- On the right of way (power line corridor) off Valley Road, crews will install foundations.
- In Cutler Park, crews will continue delivering and constructing new single-pole steel structures. The portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
Traffic Update (PDF), Week of October 15, 2018
Week of October 15, 2018:
- On High Rock Street (between the MBTA corridor and Emerson Road), crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will continue excavation for the duct bank, which houses electric cables. The road will be closed except for local traffic.
- On the right of way (power line corridor) off Valley Road, crews will install foundations.
- In Cutler Park, crews will continue delivering and constructing new single-pole steel structures. The portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction. Photos (PDF), week of October 9, 2018
Traffic Updates (PDF) week of October 8, 2018
Week of October 8, 2018:
- On High Rock Street (between the MBTA corridor and Emerson Road), crews will continue excavation for the duct bank, which houses electric cables. There will be a single lane closure, resulting in alternating traffic patterns.
- On Valley Road, crews will begin excavation for the duct bank, which houses electric cables. The road will be closed except for local traffic.
- On the right of way (power line corridor) off Valley Road, crews will install foundations and begin delivering and constructing new single-pole steel structures.
- In Cutler Park, crews will continue installing foundations and begin delivering and constructing new single-pole steel structures. The portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
Week of October 1, 2018:
- On High Rock Street (between the MBTA corridor and Emerson Road), crews continued excavation for the duct bank, which houses electric cables.
- On South Street (between Livingston Circle and South Court), excavation continued to determine the presence of underground utilities.
- On South Street (between Webster Street and Warren Street), crews continued installing a manhole (a pre-cast concrete vault).
- In Cutler Park, crews continued installing foundations. The portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction.
Traffic Update, September 17, 2018
Week of September 17, 2018 (received 9/14/18 4:45 p.m.)
- On the MBTA right of way (power line corridor) off High Rock Street, crews will continue to excavate for the duct bank, which houses electric cables.
- On High Rock Street, crews will begin excavation for the duct bank. There will be a single lane of closure, resulting in alternating traffic patterns.
- On Valley Road, crews will begin excavation for the duct bank. The road will be closed except for local traffic. (pending DPW review of new alignment)
- On the right of way off Valley Road, crews will continue with vegetation removal, placement of temporary construction matting, and foundation installation.
- In Cutler Park, crews will continue with foundation installation. The portion of the Blue Heron Trail that crosses the MBTA right of way will be closed through early December, due to construction. Report from Joe Hobbs (PDF), Needham Engineering September 14, 2018
Traffic Update for week of September 10, 2018 (PDF)
Week of September 10, 2018 (received 9/7/2018 3:15 p.m.)
- On the MBTA right of way off High Rock Street, crews will continue to excavate for the duct bank and will install a man-hole (a pre-cast iron vault).
- On High Rock Street, crews will begin excavation for the duct bank. A duct bank houses electric cables. There will be a single lane of closure resulting in alternating traffic patterns.
- On South Street, crews will continue to excavate to determine the presence of underground utilities. There will be a single lane of closure resulting in alternating traffic patterns.
- On the right of way off Valley Road, crews will continue with vegetation removal, placement for temporary construction matting and begin foundation installation.
- In Cutler Park, crews will begin foundation installation. The portion of the Blue Heron trail traversing the MBTA right of way will be closed through early December due to construction.
Traffic Update for September 5, 2018 (PDF)
Week of September 3, 2018 (received 8/31/18 1:56 p.m.)
- Crews will continue excavation for the duct bank within the MBTA right of way off High Rock Street and begin excavation of the duct bank on High Rock Street. A duct bank houses electric cables. There will be a single lane closure resulting in alternating traffic patterns.
- Crews will continue to install erosion controls in Cutler Park and continue vegetation removal and placement of temporary construction matting within the work area and to establish a safe work area.
- Crews will continue to deliver materials to the right of way off Valley Road.
- Crews will begin vegetation removal along the right of way off Valley Road.
- Crews will continue excavation to determine the presence of underground utilities on South Street. There will be a single lane of closure resulting in alternating traffic patterns.
Traffic Update for Friday August 31, 2018
South Street (between both ends of Livingston Circle)
There will be a single lane of closure for excavation to confirm locations of existing utilities between the hours of 7:00 a.m. and 5:00 p.m. Expect alternating traffic patters during this period.
Traffic Update for Wednesday August 29, 2018
High Rock Street (between Chestnut Street & Warren Street)
There will be a single lane of closure for excavation to confirm locations of existing utilities between the hours of 7:00 a.m. and 5:00 p.m. Expect alternating traffic patterns during this period.
Week of August 27, 2018: (received 8/24/18 4:43 p.m.)
- Crews will continue excavation for the duct bank within the MBTA right of way off High Rock Street. A duct bank houses electric cables.
- Crews will continue to install erosion controls in Cutler Park and begin vegetation removal and placement of temporary construction matting within the work area.
- Crews will continue excavation to determine the presence of underground utilities on Valley Road and Peacedale Road and will be delivering construction materials to the right of way off Valley Road. There will be a single lane of closure throughout the week. Expect alternating traffic patterns during this period.
- Crews will begin excavation to determine the presence of underground utilities on South Street. There will be a single lane of closure throughout the week. Expect alternating traffic patterns during this period. Week of August 20, 2018: (received 8/17/18 9:54 a.m.)
- Crews will continue excavation for placing a manhole and begin excavation for the duct bank within the MBTA right of way off High Rock Street.
- Crews will begin excavation to determine the presence of underground utilities on Valley Road and Peacedale Road. There will be a single lane closure throughout the week. Expect alternating traffic patterns during this period.
- Crews will begin to install erosion controls in Cutler Park.
Week of August 13, 2018:(received 8/10/18 1:17 p.m.)
- Crews will begin excavation work for placing a man-hole with-in the MBTA right-of-way off High Rock Street.
Week of August 6, 2018: (received 8/3/18 9:16 a.m.)
- Crews will continue survey work along the Project route and will be working in the MBTA right of way off High Rock Street to determine the presence of other underground utilities.
- Crews will also continue installation of a temporary right of way access road, installation of erosion control measures and staging storage bins for upcoming work.
Week of July 30, 2018: (received 8/3/18 9:16 a.m.)
- Crews will continue survey work along the Project route and will be working in the MBTA right of way off High Rock Street to determine the presence of other underground utilities.
- Crews will also begin installation of a temporary right of way access road, install erosion control measures and stage storage bins for upcoming work. 7.27.2018 Eversource Weekly Update (PDF)
7.20.2018 Eversource Weekly Update (PDF)
7.13.2018: Project Plans (Part 2 of 2) (PDF)
7.13.2018: Project Plans (Part 1 of 2) (PDF)
7.6.2018: Underground Schedule (PDF)
7.6.2018: Overhead Schedule (PDF)